    Calculation: painted scaffold
Calculation: hot-dip galvanized
|
  a scaffold with all advantages
- only 3 main parts
- working platforms available in wood or aluminium
- scaffolding can be assembled and disassembled in each separate field
- round scaffolding and corners are easy to make
- safe under wind load, protection system against falling of platforms
- according to EN 12810
- compatible with Alu - Doppelgeländer scaffolding
Steel parts are dip coated ( tubes are protected against the rust even inside) or hot-dip galvanized.
|  |  | 
|  with Ringer quick lock system (patented)
|
|
|
  one system - many advantages   Quality - proved in millions of square meters 
 | |  | |  examples, beginning at the left side:
Mercedes Pappas - Salzburg
Doppelgeländer, 150m high - Moscow
Minoritenkirche - Linz
Hotel - Prague
|
|
 Ringer working platforms - safe and stable 
RINGER wooden platform load bearing classification group 3, 200kg/m2 with high security stock
length: 2,50m x 0,60m and: 3,00 m, 2,00m, 1,5m, 1,25m, 0,72m x 0,60m
RINGER Aluminium platform measures: 2,50m x 0,60m 3,00m x 0,60m
load: 2,50m/400kg/m2 3,00m/200kg/m2
|
  DG65 hot-dip galvanized - with stengthened frames All standard parts of the "Doppelgeländer" can be used.
Certification for Germany, Czech Republic, Slovakia, Slovenia, Russia, Hungary and Bulgaria.
hight: 2 m width: 0,65m interval of frames: 2,50m
load bearing classification 3 according to EN 12810
|
  SCHNELLBAUGERÜST - for hard tasks Scaffold with system platforms and diagonal and horizontal braces. Extremly stable scaffold, there is a choice of working platforms of wood or aluminium.
bearing load classification to 3, 200 kg/m², according to Euro Norm HD 1000
frame hight: 2 m frame width: 0,65 m interval of frames: 2,50 m
- round scaffolding and corners are easy to make
- no small parts such as screws, wedges, etc.
- safe under wind load
- to assemble with our tools
- safety system-self locking
- produced with inspected steel tubes, hot-dip galvanized or dip coated (also inside the tube)

 | |  examples, beginning at the left side:
Steigenberger Hotel - Linz
Abtei - Puchheim
Opera - Graz
AMS - Graz
|
|
   ALU-KOMBI-DOPPELGELÄNDER scaffold The variation of the “Doppelgeländer” in aluminium, with aluminium platforms
frame height: 2 m frame width: 0,65 m interval of frames: 2,50 m
- Compatible with the "Doppelgeländer" steel scaffold
- No small parts such as screws, wedges, etc.
- Ringer patented rapid lock system

|
  Ascents with steel or aluminium ladder
steel ladder 2,5m hot-dip galvanized, for every scaffold with frame height of 2 m and frame interval of 2,5m width of stairs: 0,50m
ladder also available in aluminium with same measurments but width 0,60 m
|
 Scaffold ladder and safety basket EU hot dip galvanized you can use the scaffold ladder with a safety basket EU at the end or in the middle of the scaffold as an outside ascent
for every floor you only need: 1 ladder - 2 m 1 safety basket
|
 Aluminium working platform  Aluminium platform with trap door and integrated ladder ladder with roller
the innovative closure for a easy locking
|
 
|