
Project Data
Year of completion: 2021
Country: Austria
Expertise: Apartments
Application: Slab, Wall
Products in use
Alu Master3S Platform
FlexAluDEK
PropsTransport Container
Stacking Pallet
A 6-storey residential complex is currently being built on the edge of the popular excursion and holiday destination of St. Wolfgang. With direct access to the lake and just a few minutes walk into the town center, this construction project promises pure quality of life.
The Kieninger-Brandl consortium used the AluDEK slab formwork system from RINGER to ensure rapid construction progress. For foreman Quehenberger, the advantages of the system are obvious. The light aluminum elements with only 16kg/m² could be assembled from the ground and are therefore quick and safe to assemble. The combinability with AL2000 wall formwork panels ensured flexible formwork in the pass areas. 3S-platforms and railing solutions from RINGER ensured the necessary safety on the construction site.
< back