Hydro­electric­power station​​​​​​​​​​​​​​ for Eisentratten

​​​​​​​​​​​​​​in Eisentratten, Austria

Project Data

Year of completion: 2020
Country: Austria
Expertise: Power station
​​​​​​​Application: Wall, Floor

Products in use

Alu Master Steel Master​​​​​​​ Flex floor props​​​​​​​​​​​​​​​​​​​​​ Transport container​​​​​​​ Stacking racks​​​​​​​​​​​​​​

 

The specialized construction company Forstauer was commissioned with the construction of a new hydropower plant and the manufacture of a pressure pipeline. The project started at the end of 2018 and was completed in March 2020.

Wall and slab formwork by RINGER were able to prove themselves once again in a challenging construction situation. Our long-proven Alu Master and Steel Master panels led to perfect fair-faced concrete. Also RINGER slab formwork consisting of 3S formwork panels, H20 cross beam and floor props were in use.

The project shows that the future of energy supply will be highly supported by renewable energy beams. We are delighted to have contributed to realization!

< back​​​​​​​

Back to top