Project Data
Year of completion: 2022
Country: Austria
Expertise: Commercial Construction
Application: Wall, Slab
Products in use
A new industrial park is being built in Saalfelden on behalf of WG Immobilien GmbH & Co KG. A workshop with warehouse will be built on the ground floor of the three-storey commercial building. A well-equipped radio studio, a physiotherapy office with three therapy rooms and offices will be built on the upper floor.
The company Eitler Bau was commissioned with the project and decided to build the walls with the wall formwork Master PRO with plastic coated plywood. The innovative formwork ensured rapid construction progress. Foreman Dominik Rohrmoser praised the wall formwork Master PRO, which can be operated from one side: “Thanks to the quick and easy anchoring with just one man, the work was done really quick. My team likes to work with the system! "
The ceiling was formed with the prefabricated RINGER Concreting Tables, which resulted in considerable time savings. In addition, the RINGER Concreting Platforms and 3S-Platforms were also used in this construction project. RINGER platforms guarantee flexible and safe use.
< back